In a marked change in longtime Federal Aviation Administration (“FAA”) policy regarding analysis of noise and air quality impacts from FAA initiated, directed or funded projects, FAA has substituted a single new model for the long mandated Integrated Noise Model (“INM”) and Emissions and Dispersion Modeling System (“EDMS”).  Beginning May 29, 2015, FAA policy “requires” the use of the Aviation Environmental Design Tool version 2b (“AEDT 2b”), which integrates analysis of aircraft noise, air pollutant emissions, and fuel burn.  These impacts, according to FAA are “interdependent and occur simultaneously throughout all phases of flight.”  80 Fed.Reg. 27853.  

 
The FAA policy provides for differential displacement of existing analytic models.  For air traffic and airspace procedural changes, AEDT 2b replaces AEDT 2a, already in use.  For other, ground based projects, AEDT 2b replaces both the INM, for analyzing aircraft noise, and EDMS for developing emissions inventories and modeling emissions dispersion.  The change was presaged by FAA Administrator Michael Huerta who announced in April that FAA was undertaking an “ambitious project” to revamp its approach to measuring noise.  The “ambitious project” was apparently inspired by the vocal objections to the results of the analysis using current methodologies, voiced by citizens of locals that have experienced the effects of FAA’s current, nationwide reorganization of airspace around major airports to institute procedures based on Performance Based Navigation (“PBN”).  
 

Continue Reading FAA Requires New Integrated Model for Noise and Air Quality Impact Analysis

The California Court of Appeal last week reversed a lower court decision that would have indefinitely delayed the development by Newhall Land and Farming Company of 21,308 residential units, 629 acres of mixed use development, 67 acres of commercial use, 249 acres of business park, and 1,014 acres of open space in northwestern Los Angeles County over the next 25-30 years (“Project”).  The lower court’s decision had originally granted the Petition for Writ of Mandate brought by, among others, the Center for Biological Diversity (“Respondents”), challenging, among other actions by the California Department of Fish and Wildlife (“DFW”) (“Appellant”), the revised Joint Federal/State Environmental Impact Statement/Environmental Impact Report (“EIS/EIR”) for the Project.

While the Appellate Court’s 112 page decision addressed numerous causes of action brought by Respondents in the trial court, one of the most unique and far reaching was its disposition of Respondents’ claim that the EIS/EIR’s baseline for assessing the cumulative impacts of the Project’s Greenhouse Gas (“GHG”) emissions is a procedural issue properly evaluated under the “failure to proceed in a manner required by law” standard, applicable to procedural actions, and that, employing the correct standard, the EIS/EIR’s analysis was predicated on an illusory baseline.  In a decision that is likely to be adopted in the adjudication of other California Environmental Quality Act (“CEQA”) actions challenging the evolving state and federal GHG standards, the Appellate Court firmly disagreed. 
 Continue Reading Appellate Court Grants Wide Discretion to Newhall Land and Farming Project Proponents in the Determination of the Significance of Greenhouse Gas Emissions Under CEQA

On July 27, 2012, Los Angeles World Airports (“LAWA”) released the “Specific Plan Amendment Study Draft Environmental Impact Report” (“DEIR”), involving, among other things: (1) a realignment and extension of runways to the east on the North Airfield Complex, including a separation of the two north runways to permit their unimpeded use by the largest operating aircraft, A-380s and 747-800s (“Category VI”); (2) expansion and renovation of the terminals; and (3) associated movement and potential undergrounding of surrounding thoroughfares including Lincoln Boulevard.  Sides are already forming over the proposed plan. Continue Reading Draft Environmental Impact Report for Los Angeles International Airport Airfield Project Released

Recent appellate cases have once again brought to the fore the critical importance of the “exhaustion of administrative remedies” for any potential challenger to an agency action based on noncompliance with the California Environmental Quality Act (“CEQA”), the National Environmental Policy Act (“NEPA”) and other laws meant to protect the environment and public.

In California, as example, public projects such as road construction, airport development, and power facilities, as well as private projects such as shopping centers are challenged on the basis of the failure to exhaust administrative remedies, or to present the alleged grounds of noncompliance “to the public agency orally or in writing . . . during the public comment period provided by this division or prior to the close of the public hearing . . .” Cal. Pub. Res. Code § 21177.

All too often, individuals, environmental organizations and public agencies wait to make their decisions to challenge the analysis of a project’s environmental impacts until their frustration peaks, and the time for filing a legal challenge arrives. [The usual time for filing a CEQA challenge is very short – 30 days from the filing by the agency of its Notice of Determination (“NOD”) which marks the final agency action in the CEQA process. NEPA is normally 60 days from the signing of the Record of Decision (“ROD”).] By that time, however, it is too late, because “exhaustion of administrative remedies is a jurisdictional prerequisite to maintenance of a CEQA action.” Bakersfield Citizens for Local Control v. City of Bakersfield, 124 Cal.App.4th 1184, 1199 (2004).
 Continue Reading Don’t Procrastinate: Make Your Comments on Environmental Analyses Early and Often

In what might be a surprising decision in any other Circuit, the United States Court of Appeals for the Ninth Circuit issued a ruling in Barnes v. U.S. Dept. of Transportation, United States Court of Appeals for the Ninth Circuit, Case No. 10-70718, August 25, 2011, which, while narrow, begins the process of eroding both the Federal Aviation Administration’s (“FAA”) long held position that “aviation activity . . . will increase at the same rate regardless of whether a new runway is built or not,” Barnes, at 16285, and the Federal Court’s traditional deference to it. City of Los Angeles v. FAA, 138 F.3d 806, 807-08, n. 2 (9th Cir. 1998).Continue Reading Ninth Circuit Calls FAA to Task on Environmental Impacts of New Runway

The California Supreme Court recently weighed in on the critical issue of the proper baseline to be used in assessing the environmental impacts of a proposed project under the California Environmental Quality Act (CEQA). [Agencies must use a “baseline” from which to determine whether a project’s environmental effects will be “significant.”]  In Communities For a Better Environment v. South Coast Air Quality Management District, et al., 48 Cal. App. 4th 310 (2010), ConocoPhillips Company argued that the proper baseline for environmental analysis of a project at a petroleum refinery employing existing equipment should be the maximum permitted operating capacity of the equipment, even if the equipment is operating below those levels at the time the environmental analysis is commenced. The Court rejected that argument, holding that the baseline for CEQA analysis must be the “existing physical conditions in the effected area” (i.e., “real conditions on the ground”), rather than the level of development or activity that “could” or “should” have been present according to a plan or regulation. This confirms the California CEQA Guidelines requirement that the baseline consist of the physical environmental conditions in the vicinity of the project as they exist at the time the notice of preparation of the EIR is published or at the time the environmental analysis begins. 14 Cal. Code Regs. §15125(a).
 
Continue Reading The California Supreme Court Clarifies Environmental Review Baselines Under the California Environmental Quality Act (CEQA)